+65 6951 4686 22 Sin Ming Lane, #06-76, Midview City, Singapore 573969 info@oshiana.com

BALLAST WATER TREATMENTSYSTEM DESIGN

View projects

TURN KEY SOLUTION FOR BALLASTWATER TREATMENT SYSTEM RETROFTTING

View projects

REFINED RETROFIT PROCESS& TECHNOLOGY SELECTION

View projects

COST EFFECTIVE SOLUTION

View projects

PROJECT MANAGEMENT &PLANNING

View projects

ENSURING IMO REGULATORYCOMPLIANCE

View projects

BWTS RETROFIT PHASES

1

examination of documents

  • Vessel Ballast P&ID
  • Investigate Existing BWMS
  • Machinery Arrangement drawings
  • Electrical drawings
2

Design and Detailed Engineering

  • BWTS Integrated P&ID
  • BWT System Retrofit Design
  • Electrical Modifications
  • Pressure drop Calculation
  • Flow Analysis
3

3D Scanning & On-Board Survey

  • BWTS Location identification
  • Examination of Tie in
  • Electrical Compatibility
  • Discussion of Key aspects of BWTS installation
4

Approval

  • Documents Submission to Class
5

Feasibility Study & Basic Engineering

  • Ballast System Piping Schematic
  • Conceptual pipe routing
  • Electric Load Analysis
  • Ancillary Considerations
  • Technology Selection
6

Fabrication

  • Project Management
  • Weldments
  • Pre-fabrication of pipe Spools
  • Pipe Support
  • Foundation Structure
7

Installation & Commissioning

  • BWTS installation Dry Dock / In-service
  • Mechanical / Electrical Function Test
  • Commissioning Assistance
  • Sea Trial

Our services

SKID DESIGN

Skid version is needed mainly for new build vessels: All components and the filter can be mounted on to the platform The control cabinet can be mounted or separated from…

Read more →

Design & Detail Engineering

Accuracy of the design determines the competency of the remaining process of the ballast water treatment system integration, where on the basis of preliminary study and…

Read more →

3D Laser scanning & survey

We are dedicated to work hard and smart and believe that the result we achieve are the only valid measure of our success. We believe the foundation of our business rest…

Read more →

BWTS Retrofit

Oshiana has an experienced project management team for the project planning and to install Ballast water treatment system (BWTS) Plant while vessel at In-Service / Dy…

Read more →

EGCS retrofit

IMO regulations to reduce sulphur oxides (SOx) emissions from ships first came into force in 2005, under Annex VI of the International Convention for the Prevention of…

Read more →

Feasibility Study

Based on the survey details and the 3D scan data captured, Oshiana will perform a feasibility study, where we assess the practicality of installing a BWTS (Ballast water…

Read more →

Fabrication

Oshiana has a track record of fabricating pipe spool for BWTS retrofitting. We are competent to provide optimised solution for fabrication as per marine standard. Pipe…

Read more →

Who we are

Oshiana, We are a group of Design Engineers who are highly skilled to do the ballast water treatment system, which is our core business. Our advantage is to take the decision immediately after analyzing the situation as we are proficient to identify the actual engineering challenge in this field. We believe the foundation of our business rest on honesty, responsibility and our action. We value and understand the importance of transparency and always fulfil our promises to our customers and stakeholders on time. We uphold the highest standards of integrity in all of our actions and to put forth a great and tenacious effort to prevent any violation of engineering ethics.

Regulation

The International Convention for the Control and Management of Ships’ Ballast Water and Sediments, 2004 (BWM Convention), came into force in September 2017. To date, it has been ratified by 79 countries, collectively representing 80.94% of the world’s merchant shipping tonnage. Under this convention, all types of ships, including submersibles, floating craft/platforms, FSUs, and FPSOs, are obligated to manage their ballast water in compliance with an approved Ballast Water Management Plan. Additionally, they must diligently record their ballast water management activities in a Ballast Water Record Book, adhering to the Convention’s provisions. This adherence is based on the following implementation schedule

Read more

News feed

All posts

Turn Key Solution For ballast water treatment System Retrofit

Request a quote